Family interiors in Denpasar — Project 52.219PROJECT 52.219
NEW RAJ — ARCHITECTURE & INTERIORSRESIDENTIAL

RESIDENTIAL / 14

52.219

Family interiors in Denpasar

The kitchen, bedrooms, under-stair area, and bathroom are fitted with bespoke furniture combining storage, lighting, and everyday functions.

LOCATION
Jalan Teuku Umar, Denpasar Barat, Denpasar, Bali
SPACES
Kitchen, child’s bedroom, main bedroom, under-stair area, and bathroom
TALK ABOUT YOUR SPACE EXPLORE THE PROJECT

ABOUT THE PROJECT / 52.219

Details shaped
around daily life.

Under-stair storage, a multifunctional bed, and a floating vanity make use of each area. Rounded corners and integrated drawers are considered in the child’s bedroom.

SCOPE OF WORK

  • Interior design
  • Kitchen cabinetry
  • Wardrobe
  • Child’s bedroom interior
  • Main bedroom interior
  • Under-stair cabinetry
  • Vanity
  • Washbasin cabinetry and mirror

DESIGN APPROACH

PROJECT
HIGHLIGHTS.

52.219
  1. 01

    Under-stair cabinetry with warm LED lighting.

  2. 02

    A child’s bed with drawers, shelves, a desk, and rounded corners.

  3. 03

    A floating vanity with divided drawers and an LED mirror.

  4. 04

    Ceiling-height kitchen cabinets maximize storage.

  5. 05

    A bathroom mirror incorporates shelving and concealed LEDs.

  6. 06

    Pull-out stainless-steel dish racks use soft-close runners.

  7. 07

    A curved floating TV console pairs with wall shelves.

  8. 08

    Glass-topped bedside tables flank the main bed.

  9. 09

    The child’s wardrobe includes adjustable rails and internal drawers.

  10. 10

    Children’s book and display shelves feature rounded corners.

AT A GLANCE / 52.219

YOUR SPACE.
OUR APPROACH.

Ready to discuss your interior? Tell our team about the location, how you use the space, and the atmosphere you want to create.

START A CONVERSATION
Project number
52.219
Client
Devi Pradasari
Project type
Residential
Location
Jalan Teuku Umar, Denpasar Barat, Denpasar, Bali
Project coverage
Kitchen, child’s bedroom, main bedroom, under-stair area, and bathroom
Completion year
2026
Project duration
40 days
View the original project
NEXT PROJECT / 52.294A home interior in Nusa PenidaCONTINUE EXPLORING